When can I charge my EV using my Level 2 Plus?
Users can start charging their electric vehicles with their Level 2 Plus charger once it is installed, powered on, and the LED halo shows a steady green light. The charging process starts automatically when connecting the EV connector/charging cable to their vehicle's charge port/input. However, if the charger is locked or a charging session is scheduled using the Generac EV Charging app, the charging process will not start until the user unlocks the charger or cancels the scheduled session.