How Do I Commission a Generator in the Field Pro Application?
Explains how installers commission generators with a Power Zone 200 controller using the Field Pro mobile app, including the required on-site Bluetooth connection, registration, configuration, system testing, and activation. It also explains Mobile Link date and time behavior and optional ATS registration to help ensure the generator is correctly configured for AUTO mode.